Changes to WRBX (Railfreight Buxton Stone)
Date |
Fault |
2020.10.11 |
If the morning train to Briggs Sidings was seriously delayed, it became the afternoon return and the morning return was cancelled, but the afternoon arrival was not cancelled. |
The password for the updated copy of WRBX is the destination of the 04.10 departure
from Topley Pike, all in lower case.
Click here to download the corrected version. You will need to enter WRBX (all in capitals) as
the user name, and the password mentioned above.