Changes to WRBX (Railfreight Buxton Stone)

Date

Fault

2020.10.11

If the morning train to Briggs Sidings was seriously delayed, it became the afternoon return and the morning return was cancelled, but the afternoon arrival was not cancelled.
If an attempt was made to use an Earles engine for a stone departure, it was penalised but accepted, leaving no engine to be sent to Earles.

The password for the updated copy of WRBX is the destination of the 04.10 departure
from Topley Pike, all in lower case.

Click here to download the corrected version. You will need to enter WRBX (all in capitals) as
the user name, and the password mentioned above.